Category


Environmental Assessment

Ascot Resources Premier Gold Mine Baseline Assessment

Ascot Resources Premier Gold Mine Baseline Assessment

Ascot Resources is a junior exploration company publicly traded on the TSX Venture Exchange.  Ascot has contracted EcoLogic to manage the baseline assessment program for the Premier Gold Mine in northern British Columbia. The Premier underground mine is located 25 km from Stewart BC. It operated from 1918 to 1952, producing 2 million ounces of..

Tahsis/Zeballos Unity Trail

The Village of Tahsis awarded Onsite Engineering a contract to complete engineering and environmental assessments for a proposed multi-use trail between Tahsis and Zeballos. EcoLogic undertook field work for the environmental assessment portion, including environmental consulting for stream-crossing designs, recommending site-specific considerations and enhancements, and preparing and submitting for approvals under the Forest and Range..

District of Mission Forcemain Upgrade

The District of Mission retained Onsite Engineering to undertake the design, tender, and construction of the Fraser River Forcemain Upgrade. EcoLogic provided environmental support to the project engineering designer to obtain necessary project permits and approvals in order to proceed with construction. The previous environmental assessment was reviewed and updated in order to satisfy the..

De Beers Canada Inc. Chidliak Diamond Exploration Project

Peregrine Diamonds Ltd. contracted EcoLogic to prepare a Draft Environmental Impact Statement Guidance Plan for the Chidliak Diamond Exploration Project in 2015. The plan provided direction for Peregrine’s management regarding the Environmental Impact Statement (EIS) process in Nunavut. EcoLogic’s Guidance Plan included: a summary of the requirements outlined by the Nunavut Impact Review Board regarding..

Red Mountain

The Red Mountain Gold Mine is a proposed underground high-grade gold mine near Stewart, BC. EcoLogic was selected to manage the terrestrial portion of the environmental assessment, including performing a gap analysis of previous work, mapping regional and local soils and ecosystems, and conducting rare plant surveys. Field work was carried out with the guidance..

Willa Mine and Maxx Mill Projects

EcoLogic and Onsite Engineering worked with MX Gold on their Willa Mine and Maxx Mill projects in the West Kootenays to help guide them through the approvals process to obtain and process a bulk sample, and provided technical and environmental services. Onsite engineers provided geotechnical and engineering services, while EcoLogic ecologists performed Terrestrial Ecosystem Mapping..